I hope I have covered all the points we noted

Outside Back step - Remake

Back yard drainage

Fence panels & post - down to guests' over exuberance…

Outside tap - new

Shed roof leaks.

Pipe loose outside bathroom

Outside front

Downspout - repair & extend

Coping stone on steps loose

Gatepost loose

Finish above bay window

Cubby hole door - repair

Windows - painting

Kitchen

Floor - extend tiled area ?

Wall cupboard fix bottom shelf to upright

Door to middle room (fire regs?) replace ?

Corner cupboard - decorate

Damp (rising?) treat

Middle Room

Damp " "

Door to front room broken glass presumably

Accidental damage.

 

Groundfloor Front

Window sashes

 

Bathroom downstairs

Broken lights 2

Ceiling wood inspection cover - set in

Floor - tile

 

Staircase & landings

Bannister & missing uprights LGF.

Flight needs checking

Missing upright GF

Door bell & boxes reroute and make

more audible.

Fire alarm Red box (party damage)& system needs checking

Carpet

Landing window - sashes and treatment

 

First Floor back (Andy's)

Window - Repair and paint

Water heater - not working

Myles' room

Sashes and repairs to bothWindows - or replace

Heater needs repair

Carpet

Tim's Attic

Hole in ceiling - change ceiling for

Boarding?

Blinds for Velux windows ?

Heater?

 

 

You can see from the above list that there is much that can be done to the house in the coming year. Just how much, will be governed by the funds I can utilise. Ideally I would like to deal with all of these outstanding repairs and refurbishments as swiftly as I can. How quickly and definitively I am able to do this depends on how much I can support of a further loan in addition to the £10,000 pounds spent on the house last year. I would need to take out a further loan of £7500 as a minimum figure in order to fund a full programme of repairs and replacements in an acceptable timescale.

I would prefer this proposal rather than any short term patch and paint operation but the loans have to be covered in part at least by the first increase in rent for over two years. This would otherwise be the third year at the same rent. My original figure of £ 5 per week (£21 pcm) is realistic if we are to fund the ideal programme and any lower negotiated figure would inevitably adversely affect the scope and timescale.

The lowest acceptable increase would be £3.50 p week which would be £ 15 pcm rounded down. The question is how much of the work can be covered now with that lower figure. If I can take it that you will opt for the smallest increase then we need to decide which are the highest priorities.

The new contracts will go from the end of June as will the increase in rent so there will be a balance of £90 which if it helps can be paid in two lots of £45 added to this month's rent and next month's .

I have been advised to follow the system of six monthly shorthold tenancy an option in the current contract. This will give us an opportunity to modify, by negotiation any aspect of our agreement which you or I might feel is desirable at the half yearly stage.

.

Two final points :-

The original agreement asked for the payments to be monthly DD's. to reach my account by the 1st of each month.

I would appreciate your setting this up as otherwise the account goes into deficit and I incur charges. Obviously this cannot start until September.

Following on from this I would like to have the cheque due

now by Friday 30th July. To prevent the deficit balance occuring

Final, final point ! I am not 100% certain how available Phil

is going to be in the short to medium term so we need to decide our priorities and get cracking …

 

Regards to all Peter Cassidy